EAN code | 8595568924773 |
Customs code | 39259020 |
Weight | 1,5600 kg/m |
Colour | white |
Material | PVC |
Leadless material | yes |
Self-extinguishing | 30 s |
Temperature resistance | -5 - 60 °C |
Flaming loop test | 850 °C |
Mechanical protection | IK07 |
Impact resistance | 1 J |
Antibacterial | yes |
Width | 170 mm |
Height | 67,5 mm |
Length | 2 m |
Inside area | 4200, 2500 |
Allowance The trunkings are available in lengths with a tolerance of ± 0.5% at 20 ° C. | |
Use they are resistant to aggressive and chemical environments. They do not resist UV radiation, they are not suitable for outdoor use. | |
Manufactures´s recommendations When mounting SK 40X33 into trunking, you cannot use devices with a greater mounting depth, e.g. with a surge protection device. The producer recommends checking the depth of a particular device before installating. To install devices with very round corners, KOPOS recommends using of the KP PK instrument box and drilling the hole in the lid using the VPT 64 drill. | |
Area with explosion danger Electro-installation trunking (insertive, rectangular, halogen-free) and parapet canals with accesories can be installed in zones with explosion hazard of flammable gases (zone 2) and with the risk of explosion of flammable dusts (zone 22), installation must comply with EN 60079-14. | |
Fire reaction class of underlying material | A1 - F |
Allows to install double-socket | yes (only KP PK) |
Protection types | IP 40 |
Standards | ČSN EN 50 085-1 |
Fire resistance standards | ČSN 73 0895, DIN 4102-12, STN 92 0205 |
Package description | package - cardboard |
With protective foil | yes |
Designed for installation of standard and modular devices 45 x 45 or 45 x 22,5 mm. KOPOS recommends installing QUADRO instruments, tailor-made for KOPOS products. The installation devices from other manufacturers is possible e.g. ABB, PEHA, Legrand, OBO Bettermann, Schneider Electric Altira with maximal depth of 52 mm. It is necessary to use the device box KP 80 PK or KP PK for the assembly of classic devices. The closed box KP 80 PK is snapped into the body of the channel and the lid is attached to the box. The open device box KP PK is snapped into the bottom of the channel and the lid must be drilled with a VPT 64 drill. Maximum number of modular instruments placed next to each other is 3 pcs. When installing multiple instruments next to each, it is necessary to put about 5 cm wide piece of lid after 3 pieces to fasten them. There is no need to use any covers for the final installation of modular device. The lid is cut to the desired length and inserted next to the instrument.